Case Study

Bespoke Wire & Rope (BWR)

Industry
Construction and Engineering (Wire Rope, Cables and Tensile Structures)
Service tier
Technical

The Challenge

Bespoke Wire & Rope supplies custom cables, mesh and tensile structures to projects across Australia. As the number of live projects grew, drafting and shop drawings fell behind, take-offs stacked up and quotes were slower to go out.

Hiring drafting staff locally was expensive and slow, and every delayed drawing put a tender at risk.

What We Did

We placed a dedicated drafting support team member in our Bangkok office, working inside BWR's existing tools: Microsoft Teams for communication, Planner for tasks and SharePoint for structured project files.

The team took over shop drawings, take-offs and bills of materials, with daily updates on active tasks and Australian management oversight, so the in-house team could focus on engineering and client work.

The Results

40%

Faster drafting turnaround

50%

Fewer tender delays caused by drawing backlog

20 hrs

Saved each week for the in-house engineering team

Drafting no longer holds up our tenders. The team works inside our own tools and we get updates every day without having to chase.

Name Surname
Name Surname Role, Bespoke Wire & Rope